Lattice Boom Crane with a 126m Main Boom and 12m Jib Deployed by Sarens in Remote Site in Mexico
Sarens deployed a Liebherr lattice boom crane with an extended 126-meter main boom to replace wind turbine components at a remote Mexican wind farm, where smaller telescopic cranes lacked the necessary reach and capacity. The project involved a 559-kilometer journey to site, six days of setup, and careful coordination to work within the challenging terrain and limited space at the location.
9 November 2026 · Summary by Dynamic · Original reporting by Heavy Lift News
SENNEBOGEN is building a new training facility in Straubing, Germany, investing roughly four million euros to expand apprenticeship programs across eight technical trades. The company hired a record 50 apprentices in 2026 and plans to open the 1,800-square-meter center in September 2027, addressing the growing challenge of finding skilled workers.
The KAHL Group recently moved a rare WR 360 C 14 diesel locomotive built in the late 1930s to a new museum home, transferring the 43-ton machine from rail onto a specialized heavy-duty truck for the journey. The successful transport demonstrates how modern logistics can serve the preservation of industrial heritage.
Blue Diamond Attachments has partnered with SmartEquip Network to make its replacement and wear parts available through a centralized digital procurement platform. This move allows rental companies and fleet owners to order genuine Blue Diamond parts alongside their existing purchasing workflows, streamlining maintenance and parts sourcing.
Heavy Equipment Guide: Industry News · 21 Nov 2026